Slab pads
Fill and base built up for a concrete pour.

Installation & site work
Before a slab, shop or barn goes up, the pad has to be level, built up where needed and topped with base. We grade the site, bring fill dirt and road base, and get the pad ready for the next trade.

Fill and base built up for a concrete pour.
Metal building and barn pads.
Smaller pads for sheds and equipment.
Fill dirt and road base are both materials we sell by the ton, so the pad gets built with our own loads.
West of I-35 you often hit limestone close to the surface. East of it, the Blackland clay moves with moisture. Either way, the pad needs to be shaped and built for the ground it sits on.
Set the area level and shaped.
Fill dirt where the pad needs height.
Road base on top.
Pack it down for the next trade.
Yes, by the ton. See fill dirt delivery.
Yes. Send us the size and your address.
This page covers the pad. Ask us about the rest of your project.
We work out of Hutto and deliver about 120 miles around it. Farther is possible if the haul is paid for. We’ve hauled as far as Amarillo and Padre Island.
Every load is priced by address.
Tell us what you need and where.