BASED IN HUTTO. WORKING ACROSS CENTRAL TEXAS.LET’S TALK 512 982 4065

Installation & site work

Site & pad prepPADS FOR SLABS, SHOPS AND BARNS.

Before a slab, shop or barn goes up, the pad has to be level, built up where needed and topped with base. We grade the site, bring fill dirt and road base, and get the pad ready for the next trade.

A building pad edged with limestone blocks with finished base.

WHERE IT HELPS.

01

Slab pads

Fill and base built up for a concrete pour.

02

Shops and barns

Metal building and barn pads.

03

Sheds and small pads

Smaller pads for sheds and equipment.

HOW WE DO IT.

Fill and base from our yard

Fill dirt and road base are both materials we sell by the ton, so the pad gets built with our own loads.

Clay and rock

West of I-35 you often hit limestone close to the surface. East of it, the Blackland clay moves with moisture. Either way, the pad needs to be shaped and built for the ground it sits on.

HOW THE JOB GOES.

  1. Clear and grade

    Set the area level and shaped.

  2. Build up

    Fill dirt where the pad needs height.

  3. Base

    Road base on top.

  4. Compact

    Pack it down for the next trade.

QUESTIONS WE GET

Do you deliver foundation fill?

Yes, by the ton. See fill dirt delivery.

Can you prep a pad for a metal building?

Yes. Send us the size and your address.

Do you pour the slab?

This page covers the pad. Ask us about the rest of your project.

WHERE WE BRING IT.

We work out of Hutto and deliver about 120 miles around it. Farther is possible if the haul is paid for. We’ve hauled as far as Amarillo and Padre Island.

TEXT US YOUR
ADDRESS. GET A QUOTE.

Every load is priced by address.
Tell us what you need and where.

Text us your address for a free quoteOr call (512) 982-4065